SibBurMash
About company
News
Sampling core
Production
Core selection and quality
Casing with liners
Core selection and quality
Casing with liners
Contacts
RU
info@sibburmash.ru
sbm@sibburmash.ru
About company
Production
Contacts
RU
About company
News
Sampling core
Production
Core selection and quality
Casing with liners
Submit application
Home
/
Production
/
TOKS kits
/
Kit TOKS 06
Kit TOKS 06
Designed for fixing liners that do not require isolation of the annulus with cement slurry due to the geological features of the productive formation and the technology of the wellbore.
Submit application
Equipment
Casing shoe TOKS 20
Designed to equip the bottom of the liner when running into an open hole.
Bow-spring centraliser BSC
It is intended for centering and cementing columns that are lowered into the well in a side unsettled trunk.
Rigid-type centralizer
Designed for centering downhole pipes in the inter-tube space.
Top packer TOKS 02-04
Designed for sealing the inter-pipe space with a chain to exclude the penetration of gas and aggressive liquids into the hardening grouting mixture.
Ball
Designed to activate the hydraulic suspension, upper packer in the working state.
Hydraulic hanger TOKS
Designed to suspend the liner in the interval of a cased well.
Installation tool TOKS 01-08
Designed for running the liner into the well, activating its tooling and disconnecting from the transportation string.
Contact us
Submit application
By clicking the button, you agree to our
privacy policy
.
Thank you!
Your application is accepted
Our manager will contact you shortly!