Kit TOKS 08 (1 stage)

Designed for running the filter and liner in three stages with a tight connection of the casing sections and subsequent cementing
Submit application
Equipment

Designed to equip the bottom of the liner when running into an open hole.

Designed to activate the hydraulic suspension, upper packer in the working state.
It is intended for installation as part of the shank both in the cementing interval and outside it, to ensure reliable isolation and separation of productive layers.
Designed for lowering and suspending the shank and then disconnecting the transport column from it in wells with a horizontal end.
Designed for disconnecting the first section of the shank from the transport column and connecting to the second section.