Kit TOKS 08 (2 stage)

Designed for running the filter and liner in three stages with a tight connection of the casing sections and subsequent cementing
Submit application
Equipment

Designed to equip the bottom of the liner when running into an open hole.

It is intended for centering and cementing columns that are lowered into the well in a side unsettled trunk.
Designed to activate the hydraulic suspension, upper packer in the working state.
It is intended for installation as part of the shank both in the cementing interval and outside it, to ensure reliable isolation and separation of productive layers.

It is intended for cementing secret casing columns in order to prevent the impact of high hydrodynamic pressure on the productiокve reservoir when selling cement solution in the annulus space.

Designed for lowering and suspending the shank and then disconnecting the transport column from it in wells with a horizontal end.
Designed for disconnecting the first section of the shank from the transport column and connecting to the second section.
Designed to disconnect the first liner section from the transportation string during two-stage cementing.
Designed for docking with a funnel of a disconnector for multi-section running of liners.
Designed for planting displacement and suspended plugs at the moment of completion of the cementing process (receiving a "Stop" signal) during two-stage cementing.
Designed to suspend a liner in an open wellbore with a horizontal end.
Designed to disconnect the transportation string from the liner in wells with horizontal ends.