Designed for fixing non-cemented liners in wells with horizontal completion and subsequent multistage hydraulic fracturing using balls of different diameters.
Designed to be installed as part of a liner both in the cementing interval and outside it, to ensure reliable isolation and isolation of productive formations.
It is intended for installation as part of the shank both in the cementing interval and outside it, to ensure reliable isolation and separation of productive layers.