Kit TOKS 04

Designed to prevent the impact of high hydrodynamic pressure on the productive formation during the sale of cement solution in the annular space when cementing long shanks in order to avoid cases of under-release of cement solution when using direct single-stage cementing.
Submit application
Equipment

Designed to equip the bottom of the liner when running into an open hole.

It is intended for centering and cementing columns that are lowered into the well in a side unsettled trunk.
Designed for centering downhole pipes in the inter-tube space.
Designed for hanging countersunk casing strings in a well lined with a casing string.
Designed for sealing the inter-pipe space with a chain to exclude the penetration of gas and aggressive liquids into the hardening grouting mixture.

It is intended for landing of sales and suspension traffic jams at the moment of completion of the cementing process (receiving the "Stop" signal) during two-stage cementing.

Designed to activate the hydraulic suspension, upper packer in the working state.
It is intended for separation of drilling and cement solutions in the drill string, as well as for receiving the signal of the first "Stop".
It is intended for separation of drilling and cement solutions in the drill string, as well as for receiving the signal of the first "Stop".

It is intended for installation as part of the shank both in the cementing interval and outside it, to ensure reliable isolation and separation of productive layers.

It is intended for cementing secret casing columns in order to prevent the impact of high hydrodynamic pressure on the productiокve reservoir when selling cement solution in the annulus space.

It is intended for installation as a part of the shank in the roof of the formation to prevent the impact of high hydrodynamic pressure on the productive layer when selling cement mortar in the annulus space.
It is intended for cementing secret casing columns and is used in wells to prevent the impact of high hydrodynamic pressure on the productive reservoir when selling cement solution in the annulus space.
It is intended for landing the sales plug (receiving the signal of the first "Stop" of the first stage of cementing), separation of cement and drilling fluids during movement along the shank from the installation tool to the landing coupling. When landing the suspension plug together with the sales plug in the landing clutch, it serves as a Stop signal.
It is intended for landing the sales plug (receiving the signal of the first "Stop" of the second stage of cementing), separation of cement and drilling fluids during movement along the shank from the installation tool to the landing coupling. Landing the suspension plug together with the sales plug in the landing clutch serves as a Stop signal.
Designed for lowering the shank into the well, activating its technological equipment and disconnecting the transport tool from the shank after cementing.