It is intended for landing the sales plug (receiving the signal of the first "Stop" of the second stage of cementing), separation of cement and drilling fluids during movement along the shank from the installation tool to the landing coupling. Landing the suspension plug together with the sales plug in the landing clutch serves as a Stop signal.