Designed to be installed as part of a liner both in the cementing interval and outside it, to ensure reliable isolation and isolation of productive formations.
- Prevent slurry backflow during cementing.
- Prevention of fluid flow through the inner channel of the pipes.
- Lightening the weight of the casing string when it is immersed in the drilling fluid.