Kit TOKS 11

Designed for fixing liners cemented above the MSHF interval in wells with horizontal ends.
Submit application
Equipment
Provides guidance when running the liner casing into the open hole.

Created for:

  • Prevent slurry backflow during cementing.
  • Prevention of fluid flow through the inner channel of the pipes.
  • Lightening the weight of the casing string when it is immersed in the drilling fluid.
Designed for multi-interval staged hydraulic fracturing.
It is intended for centering and cementing columns that are lowered into the well in a side unsettled trunk.
Designed for centering downhole pipes in the inter-tube space.
Designed for multi-interval staged hydraulic fracturing.
Designed for multi-interval staged hydraulic fracturing.
Designed for grinding large parts of liner tooling during drilling.
Designed for hanging countersunk casing strings in a well lined with a casing string.
Designed for cementing of hidden casing strings in order to prevent the impact of high hydrodynamic pressure on the productive formation when pushing cement slurry into the annulus.
Designed for sealing the inter-pipe space with a chain to exclude the penetration of gas and aggressive liquids into the hardening grouting mixture.

It is intended for landing of sales and suspension traffic jams at the moment of completion of the cementing process (receiving the "Stop" signal) during two-stage cementing.

Designed to seal the annular space.
Designed for the technology of separation of layers and isolation of interstratal crossflows and other types of work when casing and operating wells.
Designed to be installed as part of a liner both in the cementing interval and outside it, to ensure reliable isolation and isolation of productive formations.

It is intended for installation as part of the shank both in the cementing interval and outside it, to ensure reliable isolation and separation of productive layers.

Designed to be installed as part of a liner in the top of the formation to prevent the impact of high hydrodynamic pressure on the productive formation when pushing the cement slurry into the annulus.
Designed for cementing of hidden casing strings in order to prevent the impact of high hydrodynamic pressure on the productive formation when pushing cement slurry into the annulus.
Designed for fixing the packer and tubing string in the well casing during hydraulic fracturing.
Designed to suspend a liner in an open wellbore with a horizontal end.